Midwestern Reclamation Site Project
Final Report from the Indiana Geological Survey to the Indiana Division of Reclamation
Photoarchive
The thumbnails below provide an overview of various reclamation and monitoring
activities. Full-size versions of the thumbnails are available upon request.
Pre-reclamation Conditions
| Refuse deposit in central part of study area, near Monitoring Well 2, looking northeast toward vegetated spoil deposits |
 |
North Pond, looking south |
 |
| South Pond, looking west |
 |
View of spring from above, looking southeastward |
 |
| View of spring from below, looking northwestward |
 |
View of spring from below, looking northwestward |
 |
| View of spring from below, looking northwestward |
 |
View of seep, in vicinity of former mine slope |
 |
| View of highwall on west side of North Pond |
 |
View of Central Pond |
 |
| Apparatus for conducting pump test on South Pond |
 |
Outflow from pump test; flow was determined by measuring the time it took to fill the tank
|  |
| Measuring field chemistry during quarterly sampling |
 |
Measuring flow from the spring during pre-reclamation period |
 |
| Measuring flow from the spring during pre-reclamation period |
 |
Instruments for measuring flow from the PALD |
 |
| Instruments for measuring flow and chemistry at outlet from site |
 |
Instruments for measuring flow and chemistry at outlet from site |
 |
| Servicing of autosampler (foreground) |
 |
Re-installation of autosampler into protective box |
 |
| Sampling water at outlet from site |
 |
Instruments for field measurements of pH, Eh, and conductivity |
 |
| Filtration of water samples in field |
 |
Titration of water sample in field |
 |
| Bailing a water sample |
 |
Bailing a water sample |
 |
| Bailing a water sample |
 |
Drilling a monitoring well |
 |
| Weir for measuring streamflow; view from upstream |
 |
Weir for measuring streamflow; view from downstream |
 |
| Preparation of refuse surface for emplacement of ash fill |
 |
Emplacement of ash fill |
 |
| Emplacement of ash fill in area of South Pond |
 |
Emplacement of ash fill |
 |
| Emplacement of ash fill in area of South Pond |
 |
Preparation of refuse surface for emplacement of ash fill |
 |
| Condition of spring during reclamation |
 |
|
|
| View of PALD from below, looking southwestward |
 |
View of PALD from the side, looking southward |
 |
| View of PALD from above, looking northeastward |
 |
View of final sediment pond from above, looking northeastward |
 |
| View of outlet from site, looking northnorthwestward |
 |
|
|
| View of wetland from above, looking downward (northward) |
 |
View of wetland from above, looking downward (northward) |
 |
| View of outlet from uppermost cell of wetland |
 |
View of one of the middle cells of wetland |
 |
| View of one of the middle cells of wetland |
 |
View of the area of the former North Pond, looking southward |
 |
| View northward across central refuse area, looking toward area of former North Pond |
 |
View north-northeastward across central refuse area; Monitoring Site 7 is near the pile of turkey manure in the center; the upper sediment pond appears in center-right |
 |
| View of the area of the former South Pond, looking northwestward |
 |
First year's nurse crop on capped and revegetated portion of central refuse area |
 |
Geology | GIS/Maps | About Us | Bookstore | Interactive Maps | Licensing
IGSInfo@indiana.edu / 812-855-7636
Accessibility Information
Copyright, Map Disclaimer, and Limitation of Warranties and Liability